... ... ... ...

Jun

5

Rounding the final corner

By fr33bird

Ahhh, one more day of building and tuning before round 3 of polini cup.  Things are shaping up, but still a lot to do.  Another quick update before I pass out and start all over tmw.  Heres some (crappy) pics from the last two days.

020

Out with the old, in with the new.

Bye little guy.  You were so little and cute.

 

drag hobbit

drag hobbit

 I just think this looks funny.  Stretched out hobbit.  Maybe I will adapt it to look like this for the drag season.

 

goop

goop

Since the walls of my cases were so thin there wasnt enough material to get a good seal, so we just jb welded the entire case closed.  Oh well.  I have plans for a new motor build before round 4, so this is just kinda temporary.

002Another thing that sucks about custom builds.  Nothing fits right anymore.  Couldnt find any threads that were close to the right size for this set up.  Had to take minarelli studs and thread them longer.  Real pain in the ass.

004017Motor is installed and the bike runs.  Had to adapt the old exhaust to the new cylinder.  No biggie.  Fired it up in the parking lot.  Seems good.  Kinda just let it warm up. The tuning will start tmw.  We’ll see what this baby is made of.

025Jimmy’s chamber.

028Worlds sexiest moped part.

 

001

Jimmy’s stubby.

018

013

There’s a couple real hints since the unveiling is just over 12 hours away.  My bike is running and ready for tuning.  Jimmy’s bike just needs a pipe mounted up.  We tore down jimmy’s bike for powder coat last night, so this is the last pics you will see of lego bike.  It will be in full on race colors next time you see it.

Sorry for the crappy pics.  If you would like better quality pics on the blog, I am taking donations for a new camera.  Feel free to email me for my paypal.  Thanks.

Jun

3

All kinds of action for your day at the office

By Rafter

Good picture quality will soon return to our blog. Heres an old picture I love.

Good picture quality will soon return to our blog. Heres an old picture I love.

Clean clean

Clean clean. You gotta get them shiny.

Tagging. Still cool.

Tagging. Still cool. Spelling not so much.

TSM

TSM. Ryan is gonna have an amazing whip sometime soon?

Derbi Start

Derbi Start DS50. Now that Scooter parts are all the rage we still only use moped parts. DS50's got's pedals! Crankshaft stolen for use on Tony's bike.

Jimmy needs special swing arm hard ware made from scratch.

Jimmy needs special swing arm hard ware made from scratch.

Secrets? Kinda. But only for two more days.

Secrets? Kinda. But only for two more days.

For any Treats lurking my blog. This was an amazing snak.

For any Treats lurking my blog. This was an amazing snak.

Jun

3

Quick update

By fr33bird

Yesterday was a long and very tedious day.  Tons of work, and not a whole lot to show for it, but things should come together today.  Look for another update late tonight, but heres some quick pics for those of you who are anxiously waiting.

photo34

photo361That plate alone is about two hours of work.  Ouch.  makes the spacing correct for the metra kit on hobbit cases.

photo37photo38

Another plate.  This one to adapt the dio reed cage for the hobbit cases.  Counter sunk holes underneath.  Tight shit.

photo39

photo41

Finally got the 80 mera top end on my bike.  Shit looks MEAN.

photo33

photo35

ts3

Nate spent hours and broke tons of drill bits doing some of the most tedious precise shit I have ever seen on a moped.  Jimmy’s bike will be unreal.  Keep watching.

Nothing fun for now.  Maybe later.  Enjoy the pics.

Jun

2

Down to the wire.

By fr33bird

4 days left till polini cup round 3, and Team Motomatic is cutting it close getting their bikes ready for the races.  It was a long tough weekend that carried into today.  Probably gonna be a lot of 12 hour days till the races.  New team rider, Jimmy Nolan, came to the shop and worked hard all weekend, and tried his hardest not to break anything else.  He’s more excited than a child on christmas day about his new bike, as he should be.  Nates really out doing himself on this one.  We’ll give you some sneak peeks and hints this week as the race comes closer, and the bike will be unveiled Friday at midnight.  Try not to die of anxiety.  Onto some pics.

0772

Hobbit got all disced out with a cr80 front wheel.  It went on pretty easy.  It got the professional race team paint job    , and I didn’t swallow and brake fluid trying to syphon it through the brake line. 

 

089087

The moment of truth came this morning when all the holes we put in my cases were filled in and smoothed out, and we finally went to press in my bearings and crank.  The first attempt was unsuccessful, crank binded up.  We had to pull apart my now very delicate cases and do some more grinding.  Attempt #2 was a success!  Giant derbi crank in hobbit cases.  Notice how thin the wall of the hobbit cases are.  This thing BARELY fits.  We are basically going to have to jb weld the cases shut once its all together to make sure the thin walls dont air leak.  crazy.

068

098

Little shit like this, is why motomatic bikes are awesome, and take tons of time to build.  Modified HPI plate for derbi crank, and 4 petal reed block adapter plate.  Nate wasn’t satisfied with my mounting technique, so we are making this up.  You wouldnt believe the time it takes to make these plates.  I spend a lot of time at the dremel.  We all do.

090

082

Possibly the most exciting part of today, was my cylinder coming back from our favorite porting guru and motomatic racer Tony Simoni.  I swallowed my “I build my own motors” pride, and handed my 80 metra cylinder over to Tony to let him do his magic.  I did a bit of work, but then turned it over to the pro to finish it off, and hopefully make this bad boy 16 hp.  It came back AMAZING.  Seriously unbelieveable stuff.  Case inducted 80 metra.  This guy doesnt mess around.  This cylinder is beautiful.  8 hours of port work according to Tony.  He has some really crazy porting tools, and its amazing to see his work.  I couldnt be happier with the results.  A big thanks to Tony.  I owe ya one.

top-secret

Onto Jimmy’s top secret race machine.  Secret box’s are all the rage theses days, so we’re playing along.  Here are some sneek peaks.  Why the big sprocket Jimmy?

081093094

What are these silly pieces?  Where do they fit into this puzzle?  Stay tuned to find out.

Well there it is Romero.  Hope you’re ready.  😉

 

Other happenings, a road gnome dropped off his bike.  Apparently he just graduated junior high and has some cash to spend on getting his moped back in running order.  He’s stoked, and we cant wait to see him on thursday nights.

Some creature girls stopped by, but we were stuffing our faces.  No worries, the other squiddies treated them to a good time.

I got a peek into Nates brain, and it looked sorta like this.

 

Tonights updates were sponsored by Pentagram and Phil Collins.